一、 電力警示帶的定義和作用
1、 Definition and function of electric warning tape
電力警示帶是指在電力設(shè)備或電纜線路附近用來警示人們注意的輔助標(biāo)志,其作用是為了提醒人們在不產(chǎn)生危險的情況下嚴(yán)格遵守規(guī)程,預(yù)防事故的發(fā)生。
Electric warning tape refers to an auxiliary sign used near power equipment or cable lines to warn people to pay attention to safety. Its function is to remind people to strictly follow safety regulations and prevent accidents from occurring without causing danger.
二、 電力警示帶的分類
2、 Classification of electric warning tapes
電力警示帶按照用途分類,主要分為“停工警示帶”、“高壓警示帶”、“中壓警示帶”、“低壓警示帶”、“零線警示帶”、“接地警示帶”等。
Electric power warning tapes are classified according to their uses, mainly including "shutdown warning tapes", "high voltage warning tapes", "medium voltage warning tapes", "low voltage warning tapes", "zero line warning tapes", "grounding warning tapes", etc.
三、 埋深規(guī)范要求
3、 Burial depth specification requirements
停工警示帶的埋深不得少于20厘米。
The burial depth of the shutdown warning tape shall not be less than 20 centimeters.
高壓警示帶壓埋深不得低于60cm;
The buried depth of the high-voltage warning tape shall not be less than 60cm;
中壓警示帶埋深不得低于40cm;
The burial depth of the medium voltage warning tape shall not be less than 40cm;
低壓警示帶埋深不得低于30cm;
The burial depth of the low-voltage warning tape shall not be less than 30cm;
零線警示帶埋深不得低于15cm;
The burial depth of the zero line warning tape shall not be less than 15cm;
接地警示帶埋深不得低于20cm。
The burial depth of the grounding warning tape shall not be less than 20cm.
四、 埋深注意事項
4、 Notes on burial depth
安裝電力警示帶的施工現(xiàn)場必須對埋深進(jìn)行掌握,并在設(shè)備或線路處設(shè)置足夠的標(biāo)識牌,以防誤傷。
The construction site for installing power warning tapes must have a clear understanding of the burial depth and set up sufficient signage at equipment or lines to prevent accidental injury.
在開挖施工中應(yīng)注意適當(dāng)?shù)母叨群蜕疃?,避免損壞電纜或電線,減少不必要的維修常規(guī)。
During excavation construction, attention should be paid to appropriate height and depth to avoid damaging cables or wires and reduce unnecessary maintenance routines.
施工人員應(yīng)及時清理施工現(xiàn)場,恢復(fù)原貌,使彎曲度達(dá)到標(biāo)準(zhǔn)要求。
Construction personnel should promptly clean the construction site, restore its original appearance, and ensure that the curvature meets the standard requirements.
五、 常見問題解答
5、 Frequently Asked Questions
電力警示帶埋深的標(biāo)準(zhǔn)是多少?
What is the standard burial depth for electric warning tapes?
答:不同種類的電力警示帶所對應(yīng)的埋深標(biāo)準(zhǔn)是不同的,一般應(yīng)該參照相關(guān)規(guī)范進(jìn)行設(shè)置。
Answer: The burial depth standards corresponding to different types of power warning tapes are different, and should generally be set according to relevant specifications.
如何安裝電力警示帶?
How to install an electrical warning tape?
答:電力警示帶安裝的具體方法應(yīng)根據(jù)不同地形、材料和應(yīng)用方式來決定,建議施工前行認(rèn)真細(xì)致的現(xiàn)場勘察和規(guī)劃,以免造成不必要的損失。
Answer: The specific method of installing power warning tapes should be determined based on different terrains, materials, and application methods. It is recommended to conduct a careful and meticulous on-site survey and planning before construction to avoid unnecessary losses.