警示樁我們大家在日常生活中應該會經(jīng)??吹?,對周邊行人主要起到警示的作用,那么您知道警示樁等相關施工方法及其工藝是怎樣的嗎?下面小編為您簡單講解一番吧。
We all should often see warning piles in our daily life, which mainly plays a role in warning the safety of surrounding pedestrians. Do you know the construction methods and processes related to warning piles? Let's give you a brief explanation.
警示樁的使用意義
Significance of warning pile
1、警示樁有比重輕、抗腐化、耐老化,密封性好的特點。具有全天候防護效果,可以滿足室外工程項目的惡劣環(huán)境
1. The warning pile has the characteristics of light specific gravity, corrosion resistance, aging resistance and good sealing. With all-weather protection effect, it can meet the harsh environment of outdoor engineering projects
2、具有良好的絕緣性能
2. Good insulation performance
警示樁等相關施工
Warning pile and other related construction
1、模具制作。警示樁模具采用圓鋼加工制作,分左右兩半,并且上面焊有緊固螺栓,以防止其振搗張開,影響其尺寸。
1. Mold making. The warning pile mold is made of round steel, divided into left and right halves, and is welded with fastening bolts to prevent its vibration from opening and affecting its size.
2、警示樁預制。預制采用集中預制,按設計要求,先澆筑保護層再放入預制好的配筋,再采用分層澆筑,用振搗器搗密實后澆筑第二層,待澆筑后達到凝固強度后,打開模具,將其表面纏覆蓋薄膜進行養(yǎng)生。
2. Warning pile prefabrication. The prefabrication adopts centralized prefabrication. According to the design requirements, the protective layer is poured first, then the prefabricated reinforcement is placed, and then the layered pouring is adopted. The second layer is poured after being compacted with a vibrator. After the pouring reaches the solidification strength, the mold is opened, and its surface is wrapped with a film for curing.
3、警示樁基礎開挖。 警示樁施工工具流動性大,零碎的特點,基礎采用人工開挖,并將底部整平壓實。
3. Warning pile foundation excavation. Warning pile construction tools have the characteristics of large fluidity and fragmentation. The foundation is excavated manually, and the bottom is leveled and compacted.
4、噴涂發(fā)光漆。 嚴格按圖紙要求的顏色、間距涂刷發(fā)光漆。
4. Spray luminous paint. Apply luminous paint in strict accordance with the color and spacing required by the drawing.
5、安裝。 根據(jù)
地埋警示樁施工具有流動性大、零碎、基礎混凝土用量少的特點,現(xiàn)將混凝土按配合比拌合成干料,在運現(xiàn)場進行加水拌合,這樣既可以避免混凝土在運輸過程中出現(xiàn)離析問題,還能節(jié)省資源,不會造成不必要的浪費。
5. Installation. According to the characteristics of large fluidity, fragmentary and small amount of foundation concrete in the construction of buried warning piles, the concrete is now mixed into dry materials according to the mix proportion, and then mixed with water after being transported to the site, which can not only avoid the segregation problem of concrete in the transportation process, but also save resources and avoid unnecessary waste.
以上就是今天為大家介紹的關于問題以及注意事項的全部內(nèi)容,希望對大家能有所幫助,想要了解更多內(nèi)容可以電話聯(lián)系我們或者關注我們的網(wǎng)站
http://tianyals.cn,我們的工作人員會及時與您取得聯(lián)系。
The above is all about the problems and precautions introduced to you today. I hope it can help you. If you want to know more, you can contact us by phone or follow our website http://tianyals.cn , our staff will contact you in time.